Triad Engineering

 
GSA Schedule
 
 
TRIAD Listens, Designs & Delivers
HOME DEPOT DISTRIBUTION CENTER
Frederick County, VA

Triad was responsible for the civil design and permitting of this 756,000 SF facility and its associated roadways, utilities, site features and parking.  Components included:
  • Due diligence
  • Parking for 252 cars, 314 trailer storage spaces and 150 loading docks
  • Drainage pipes ranging from 18” diameter to 66” diameter
  • 5 retaining walls ranging from 4.5’ to 33’ in height (including one dam)
  • Extensive grading, drainage, and sedimentation and erosion control features
  • Evaluation of storm drainage
  • Traffic impact analysis
  • Coordination with client, developer and various review agencies, including VDOT

Additionally, Triad performed a geotechnical investigation and all of the project QA/QC testing and monitoring.  We also designed a new dual turn lane along US Route 522, along with an interchange, as part of the facility's new entrance. All elements of this project were completed on time and within budget.

 Top


 
News   HEADLINES
  Events/Projects

Home Depot Distribution Center
 
 
 
USBGC Logo geoprofessional.org - Geoprofessional Business Association